Beranda

Jumlah OPD 45 Selengkapnya
Jumlah Sub Kegiatan 1,470 Selengkapnya
Jumlah Paket 2,282 Selengkapnya
Jumlah Konstruksi 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 17 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 3% 40/1,470
Paket Selesai 0% 0/2,282
Konstruksi Selesai 0% 0/5

Struktur Anggaran

BELANJA
Rp1.527.518.956.029,00 / 91%
Pegawai
Rp134.356.069.276,00 / 97%
Non Pegawai
Rp1.393.162.886.753,00 / 90%
Barang/Jasa
Rp710.334.690.703,00 / 93%
Modal
Rp682.828.196.050,00 / 87%

Struktur Sub Kegiatan

  • Jumlah 1,470
  • Selesai 40
  • Tidak Selesai 0
  • Berjalan 673
  • Belum Berjalan 757

Struktur Sumber Anggaran

  • APBD
    Rp1.851.162.734.709,00 / 69%
  • DAK
    Rp618.408.119.359,00 / 23%
  • APBN
    Rp62.455.665.315,00 / 2%
  • BANKEU
    Rp2.661.903.000,00 / 0%
  • BLUD
    Rp210.027.018.780,00 / 8%

Laporan Bulanan Fisik

Laporan Bulanan Keuangan

Rangking Pelaporan OPD

Total 45 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
2KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
3KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.064.381.092,00Rp0,0046%232300158Bulan 6
4KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
5DLHRp35.193.241.220,00Rp14.336.947.154,00Rp0,0041%5454004014Bulan 6
6BAPPERIDARp15.358.868.217,00Rp6.251.812.638,00Rp0,0041%6666005412Bulan 6
7KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
8KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
9KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
10KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
11KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
12KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
13DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
14BPBDRp17.758.169.735,00Rp6.295.265.768,00Rp0,0035%3434002212Bulan 6
15BAPENDARp59.989.984.211,00Rp20.182.247.683,00Rp0,0034%3636002412Bulan 6
16RSDPRp354.846.540.730,00Rp115.934.894.512,00Rp0,0033%442011Bulan 6
17DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
18DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
19DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
20BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
21DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
22SETWANRp94.489.614.278,00Rp119.828.152,00Rp0,000%484800444Bulan 6
23DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
24KECAMATAN CARENANGRp2.983.484.794,00Rp1.139.216.579,00Rp0,0038%161600106Bulan 5
25KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
26KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
27KECAMATAN BINUANGRp3.529.468.586,00Rp1.136.366.784,00Rp0,0032%222200148Bulan 5
28DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
29DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
30DPMDRp28.957.104.294,00Rp5.722.273.966,00Rp0,0020%3939002514Bulan 5
31INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
32DKBPPPARp11.114.252.916,00Rp1.736.744.692,00Rp0,0016%3131001318Bulan 4
33SETDARp80.964.204.138,00Rp24.727.951.793,00Rp0,0031%555500523Bulan 3
34KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
35DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
36DINKESRp265.660.188.487,00Rp32.546.906.077,00Rp0,0012%676700760Bulan 3
37KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
38KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
39DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
40KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
41DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
42DPUPRRp158.215.981.022,00Rp0,00Rp0,000%797900079Belum Berjalan
43BPKADRp19.920.777.426,00Rp0,00Rp0,000%141400014Belum Berjalan
44DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
45KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan

Kegiatan Terakhir Ditambah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
791BPBDPENATAAN SISTEM DASAR PENANGGULANGAN BENCANARp295.972.088,00
792INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp82.208.000,00
793BPBDPENATAAN SISTEM DASAR PENANGGULANGAN BENCANARp226.979.952,00
794BPBDPELAYANAN PENYELAMATAN DAN EVAKUASI KORBAN BENCANARp649.808.958,00
795INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp5.075.440,00
796BPBDPELAYANAN PENYELAMATAN DAN EVAKUASI KORBAN BENCANARp8.068.800,00
797BPBDPELAYANAN PENYELAMATAN DAN EVAKUASI KORBAN BENCANARp1.107.141.600,00
798BPBDPELAYANAN PENCEGAHAN DAN KESIAPSIAGAAN TERHADAP BENCANARp47.552.400,00
799BPBDPELAYANAN PENCEGAHAN DAN KESIAPSIAGAAN TERHADAP BENCANARp491.709.008,00
800BPBDPELAYANAN INFORMASI RAWAN BENCANA KABUPATEN/KOTARp211.022.960,00

Kegiatan Terakhir Diubah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
791BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00
792DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp413.988.000,00
793DPUPRPENYELENGGARAAN JALAN KABUPATEN/KOTARp982.755.200,00
794BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.750.000,00
795DPMDPEMBINAAN DAN PENGAWASAN PENYELENGGARAAN ADMINISTRASI PEMERINTAHAN DESARp88.907.300,00
796KECAMATAN CIRUASKoordinasi Upaya Penyelenggaraan Ketenteraman dan Ketertiban UmumRp20.745.000,00
797DPKDPENGELOLAAN ARSIP DINAMIS DAERAH KABUPATEN/KOTARp59.476.500,00
798BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
799DKPPAdministrasi Umum Perangkat DaerahRp39.445.000,00
800DPUPRPENYELENGGARAAN JALAN KABUPATEN/KOTARp201.894.850,00