Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 58/ 1,660 Selengkapnya
Jumlah Paket 0/ 2,353 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 20 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/58
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (SETWAN)

BELANJA
Rp62.620.000.000,00 / 88%
Pegawai
Rp398.495.000,00 / 63%
Non Pegawai
Rp62.221.505.000,00 / 88%
Barang/Jasa
Rp61.413.525.000,00 / 88%
Modal
Rp807.980.000,00 / 98%

Struktur Sub Kegiatan (SETWAN)

  • Jumlah 58
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 38
  • Belum Berjalan 20

Struktur Sumber Anggaran (SETWAN)

  • APBN
    Rp3.000.000,00 / 0%
  • APBD
    Rp116.440.176.326,00 / 117%

Laporan Bulanan Fisik (SETWAN)

Laporan Bulanan Keuangan (SETWAN)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KESBANGPOLRp52.652.993.200,00Rp48.696.309.798,00Rp0,0092%323200284Bulan 7
2KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
3KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
4KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
5BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
6DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
7KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
8BAPENDARp59.989.984.211,00Rp29.454.138.456,00Rp0,0049%363600288Bulan 7
9DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
10BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
11DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
12BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
13DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
14DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
15SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
16DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
17DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
18DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
19DPKDRp21.386.521.679,00Rp4.992.367.616,00Rp0,0023%3939102315Bulan 7
20KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
21KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
22KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
23KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
24INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
25DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
26KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
27SETDARp80.964.204.138,00Rp36.516.320.456,00Rp0,0045%555500541Bulan 6
28KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
29KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
30KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
31KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
32KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
33KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
34DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
35DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
36KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
37DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
38RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6
39KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
40DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
41DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
42DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
43DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
44DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
45KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
46KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
47BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
48KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan

Kegiatan Terakhir Ditambah (SETWAN)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1SETWANFasilitasi Tugas DPRDRp4.672.631.200,00
2SETWANFasilitasi Tugas DPRDRp677.220.000,00
3SETWANPenyerapan dan Penghimpunan Aspirasi MasyarakatRp12.837.900.000,00
4SETWANPelaksanaan Dan Pengawasan Kode Etik DPRDRp231.495.000,00
5SETWANPenyerapan dan Penghimpunan Aspirasi MasyarakatRp293.610.000,00
6SETWANPeningkatan Kapasitas DPRDRp1.745.440.000,00
7SETWANPeningkatan Kapasitas DPRDRp212.795.000,00
8SETWANPeningkatan Kapasitas DPRDRp326.400.000,00
9SETWANPeningkatan Kapasitas DPRDRp523.069.056,00
10SETWANPeningkatan Kapasitas DPRDRp410.301.792,00

Kegiatan Terakhir Diubah (SETWAN)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1SETWANAdministrasi Keuangan Perangkat DaerahRp59.243.900.000,00
2SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp9.340.000,00
3SETWANPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp7.962.500,00
4SETWANPelaksanaan Dan Pengawasan Kode Etik DPRDRp231.495.000,00
5SETWANPengawasan Penyelenggaraan PemerintahanRp209.100.000,00
6SETWANAdministrasi Umum Perangkat DaerahRp39.003.000,00
7SETWANAdministrasi Barang Milik Daerah Pada Perangkat DaerahRp156.711.896,00
8SETWANAdministrasi Keuangan Perangkat DaerahRp6.850.000,00
9SETWANAdministrasi Keuangan Perangkat DaerahRp41.353.600,00
10SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp3.618.750,00