Beranda

Jumlah OPD 43 Selengkapnya
Jumlah Sub Kegiatan 1,296 Selengkapnya
Jumlah Paket 2,161 Selengkapnya
Jumlah Konstruksi 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 11 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 3% 38/1,296
Paket Selesai 0% 0/2,161
Konstruksi Selesai 0% 0/5

Struktur Anggaran

BELANJA
Rp1.527.518.956.029,00 / 91%
Pegawai
Rp134.356.069.276,00 / 97%
Non Pegawai
Rp1.393.162.886.753,00 / 90%
Barang/Jasa
Rp710.334.690.703,00 / 93%
Modal
Rp682.828.196.050,00 / 87%

Struktur Sub Kegiatan

  • Jumlah 1,296
  • Selesai 38
  • Tidak Selesai 0
  • Berjalan 576
  • Belum Berjalan 682

Struktur Sumber Anggaran

  • APBN
    Rp62.446.492.515,00 / 2%
  • APBD
    Rp1.662.217.381.280,00 / 62%
  • DAK
    Rp589.513.075.624,00 / 22%
  • BANKEU
    Rp2.661.903.000,00 / 0%
  • BLUD
    Rp210.027.018.780,00 / 8%

Laporan Bulanan Fisik

Laporan Bulanan Keuangan

Rangking Pelaporan OPD

Total 43 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1SETDARp80.964.204.138,00Rp19.243.624.907,00Rp0,0024%555500496Bulan 3
2SETWANRp60.730.896.046,00Rp39.222.200,00Rp0,000%161600313Bulan 6
3BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
4BAPPERIDARp15.358.868.217,00Rp5.160.747.367,00Rp0,0034%6666005115Bulan 5
5BPKADRp19.754.828.226,00Rp0,00Rp0,000%111100011Belum Berjalan
6BAPENDARp59.989.984.211,00Rp18.667.596.407,00Rp0,0031%3636002313Bulan 6
7INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
8DINKESRp236.765.144.752,00Rp32.546.906.077,00Rp0,0014%656500758Bulan 3
9DISDIKBUDRp1.186.951.770.124,00Rp333.348.115.791,00Rp0,0028%9393002865Bulan 6
10DPUPRRp35.730.646.128,00Rp0,00Rp0,000%181800018Belum Berjalan
11DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
12DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
13DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
14DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
15DKPPRp33.211.811.573,00Rp2.015.880.773,00Rp0,006%4747002423Bulan 6
16DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
17DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
18DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
19DKBPPPARp3.369.500.268,00Rp168.944.738,00Rp0,005%242400816Bulan 4
20DPMPTSPRp15.266.896.033,00Rp0,00Rp0,000%373700037Belum Berjalan
21DPMDRp8.309.275.059,00Rp2.701.310.406,00Rp0,0033%141400104Bulan 5
22DLHRp37.613.207.406,00Rp6.617.984.429,00Rp0,0018%5656002036Bulan 3
23DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
24RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
25BPBDRp17.757.405.735,00Rp3.504.619.289,00Rp0,0020%3434002014Bulan 5
26DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
27KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
28KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
29KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
30KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
31KECAMATAN KRAMATWATURp6.710.483.685,00Rp2.492.828.655,00Rp0,0037%232300149Bulan 5
32KECAMATAN BANDUNGRp3.288.787.830,00Rp987.472.142,00Rp0,0030%191900811Bulan 4
33KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
34KECAMATAN PETIRRp3.321.271.160,00Rp0,00Rp0,000%141400014Belum Berjalan
35KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
36KECAMATAN CIKEUSALRp3.009.275.756,00Rp1.258.409.257,00Rp0,0042%11117031Bulan 6
37KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
38KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
39KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
40KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
41KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
42KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
43KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6

Kegiatan Terakhir Ditambah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
71SETWANPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp7.962.500,00
72BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp40.000.000,00
73BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp1.380.938.000,00
74BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
75BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
76BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
77BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
78BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.750.000,00
79BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00
80BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00

Kegiatan Terakhir Diubah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
71SETWANAdministrasi Umum Perangkat DaerahRp491.185.100,00
72BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp236.000.000,00
73BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
74BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
75BKPSDMPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp196.890.000,00
76BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
77BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
78BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
79BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
80BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00