Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 1,659 Selengkapnya
Jumlah Paket 2,336 Selengkapnya
Jumlah Konstruksi 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 11 Agustus 2025

Pekerjaan

Sub Kegiatan Selesai 4% 65/1,659
Paket Selesai 0% 0/2,336
Konstruksi Selesai 0% 0/5

Struktur Anggaran

BELANJA
Rp1.527.518.956.029,00 / 91%
Pegawai
Rp134.356.069.276,00 / 97%
Non Pegawai
Rp1.393.162.886.753,00 / 90%
Barang/Jasa
Rp710.334.690.703,00 / 93%
Modal
Rp682.828.196.050,00 / 87%

Struktur Sub Kegiatan

  • Jumlah 1,659
  • Selesai 65
  • Tidak Selesai 0
  • Berjalan 1,006
  • Belum Berjalan 588

Struktur Sumber Anggaran

  • APBN
    Rp62.509.411.174,00 / 2%
  • APBD
    Rp2.603.715.297.614,00 / 97%
  • DAK
    Rp680.124.450.357,00 / 25%
  • BANKEU
    Rp2.661.903.000,00 / 0%
  • BLUD
    Rp284.808.999.616,00 / 11%

Laporan Bulanan Fisik

Laporan Bulanan Keuangan

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1BAPENDARp59.989.984.211,00Rp31.470.887.420,00Rp0,0052%363600315Bulan 8
2KESBANGPOLRp52.652.993.200,00Rp49.541.491.730,00Rp0,0094%323200284Bulan 7
3BAPPERIDARp15.358.868.217,00Rp8.772.905.104,00Rp0,0057%666600588Bulan 7
4KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
5KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
6KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
7KECAMATAN TIRTAYASARp4.429.731.000,00Rp2.217.960.953,00Rp0,0050%262610196Bulan 7
8KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
9KECAMATAN BINUANGRp3.529.468.586,00Rp1.687.906.300,00Rp0,0048%222200175Bulan 7
10BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
11DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
12DISHUBRp43.906.498.155,00Rp19.326.391.648,00Rp0,0044%404000391Bulan 7
13DISKOPERINDAGRp17.670.040.047,00Rp7.625.187.190,00Rp0,0043%4848003513Bulan 7
14BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
15DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
16DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
17DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
18DPRKPRp33.593.718.408,00Rp7.092.083.403,00Rp0,0021%383840313Bulan 7
19KECAMATAN BANDUNGRp3.288.787.830,00Rp1.893.030.044,00Rp0,0058%191900145Bulan 6
20KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
21KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
22DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
23SETDARp80.964.204.138,00Rp39.440.470.544,00Rp0,0049%555500541Bulan 6
24KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
25KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
26KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
27KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
28KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
29DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
30DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
31DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
32SETWANRp116.443.176.326,00Rp48.710.695.243,00Rp0,0042%5858004018Bulan 8
33DISKOMINFOSATIKRp20.088.732.108,00Rp7.378.844.192,00Rp0,0037%4545003015Bulan 8
34DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
35DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
36DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
37INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
38DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
39DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
40KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
41BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
42KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
43RSDPRp354.846.540.730,00Rp151.016.098.699,00Rp0,0043%442020Bulan 7
44KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
45KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.627.893.539,00Rp0,0050%16168053Bulan 6
46KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
47DPKDRp21.386.521.679,00Rp5.268.335.078,00Rp0,0025%39391601112Bulan 6
48KECAMATAN CINANGKARp4.916.521.531,00Rp2.260.790.852,00Rp0,0046%191910117Bulan 3

Kegiatan Terakhir Ditambah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
291DPMPTSPAdministrasi Keuangan Perangkat DaerahRp8.679.900.000,00
292DKPPPENGELOLAAN SUMBER DAYA GENETIK (SDG) HEWAN, TUMBUHAN, DAN MIKRO ORGANISME KEWENANGAN KABUPATEN/KOTARp380.883.248,00
293DISDIKBUDPENGELOLAAN PENDIDIKAN ANAK USIA DINI (PAUD)Rp948.159.200,00
294DKPPPEMBANGUNAN PRASARANA PERTANIANRp329.483.880,00
295DISDIKBUDPENGELOLAAN PENDIDIKAN SEKOLAH DASARRp201.361.600,00
296DKPPPENGEMBANGAN PRASARANA PERTANIANRp16.432.000,00
297DKPPPENGEMBANGAN PRASARANA PERTANIANRp60.800.000,00
298DPMPTSPPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp10.012.500,00
299DPMPTSPPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp5.848.000,00
300DISDIKBUDPENGELOLAAN PENDIDIKAN ANAK USIA DINI (PAUD)Rp520.000.000,00

Kegiatan Terakhir Diubah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
291DINKESADMINISTRASI UMUM PERANGKAT DAERAHRp145.244.500,00
292INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp565.000.000,00
293INSPEKTORATPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp711.849.750,00
294INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp455.577.200,00
295INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp34.300.000,00
296INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp147.224.000,00
297INSPEKTORATPENYELENGGARAAN PENGAWASAN DENGAN TUJUAN TERTENTURp177.625.000,00
298INSPEKTORATPENYELENGGARAAN PENGAWASAN DENGAN TUJUAN TERTENTURp43.800.000,00
299INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp171.948.000,00
300INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp94.950.000,00