Beranda

Jumlah OPD 44 Selengkapnya
Jumlah Sub Kegiatan 1,335 Selengkapnya
Jumlah Paket 2,255 Selengkapnya
Jumlah Konstruksi 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 12 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 3% 39/1,335
Paket Selesai 0% 0/2,255
Konstruksi Selesai 0% 0/5

Struktur Anggaran

BELANJA
Rp1.527.518.956.029,00 / 91%
Pegawai
Rp134.356.069.276,00 / 97%
Non Pegawai
Rp1.393.162.886.753,00 / 90%
Barang/Jasa
Rp710.334.690.703,00 / 93%
Modal
Rp682.828.196.050,00 / 87%

Struktur Sub Kegiatan

  • Jumlah 1,335
  • Selesai 39
  • Tidak Selesai 0
  • Berjalan 609
  • Belum Berjalan 687

Struktur Sumber Anggaran

  • APBN
    Rp62.446.492.515,00 / 2%
  • APBD
    Rp1.668.400.539.619,00 / 62%
  • DAK
    Rp589.513.075.624,00 / 22%
  • BANKEU
    Rp2.661.903.000,00 / 0%
  • BLUD
    Rp210.027.018.780,00 / 8%

Laporan Bulanan Fisik

Laporan Bulanan Keuangan

Rangking Pelaporan OPD

Total 44 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
2DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
3DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
4DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
5SETWANRp62.691.900.590,00Rp119.828.152,00Rp0,000%212100417Bulan 6
6DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
7INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
8DLHRp36.980.708.393,00Rp8.758.753.723,00Rp0,0024%5454002430Bulan 3
9DINKESRp236.765.144.752,00Rp32.546.906.077,00Rp0,0014%656500758Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
12KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
13DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
14DPUPRRp35.730.646.128,00Rp0,00Rp0,000%181800018Belum Berjalan
15BPKADRp19.754.828.226,00Rp0,00Rp0,000%111100011Belum Berjalan
16DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
17KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan
18DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
19BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
20BPBDRp17.757.405.735,00Rp3.504.619.289,00Rp0,0020%3434002014Bulan 5
21DKBPPPARp3.369.500.268,00Rp168.944.738,00Rp0,005%242400816Bulan 4
22KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
23BAPPERIDARp15.358.868.217,00Rp5.201.709.367,00Rp0,0034%6666005115Bulan 5
24KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
25DPMPTSPRp15.266.896.033,00Rp2.124.108.851,00Rp0,0014%373700235Bulan 3
26KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
27DPMDRp8.680.688.455,00Rp2.777.862.230,00Rp0,0032%202000137Bulan 5
28KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
29DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
30RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
31DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
32SETDARp80.964.204.138,00Rp19.243.624.907,00Rp0,0024%555500496Bulan 3
33KECAMATAN KRAMATWATURp6.710.483.685,00Rp2.492.828.655,00Rp0,0037%232300149Bulan 5
34KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
35KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
36KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
37KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
38KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
39BAPENDARp59.989.984.211,00Rp18.834.801.257,00Rp0,0031%3636002412Bulan 6
40KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
41KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
42KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
43KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
44DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6

Kegiatan Terakhir Ditambah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
161DPMPTSPAdministrasi Keuangan Perangkat DaerahRp2.400.000,00
162DPMPTSPAdministrasi Keuangan Perangkat DaerahRp9.608.000,00
163DISDIKBUDPENGELOLAAN PENDIDIKAN SEKOLAH DASARRp198.942.000,00
164DISDIKBUDPENGELOLAAN PENDIDIKAN SEKOLAH DASARRp1.870.500,00
165DISDIKBUDPENGELOLAAN PENDIDIKAN SEKOLAH DASARRp1.054.400,00
166DPMPTSPPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp69.232.000,00
167DISDIKBUDPENGELOLAAN PENDIDIKAN ANAK USIA DINI (PAUD)Rp2.559.000,00
168DPMPTSPPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp10.012.500,00
169DPMPTSPPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp5.848.000,00
170DPMPTSPPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp7.090.441,00

Kegiatan Terakhir Diubah

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
161KECAMATAN BINUANGADMINISTRASI UMUM PERANGKAT DAERAHRp1.922.800,00
162INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp87.580.000,00
163KECAMATAN BINUANGADMINISTRASI UMUM PERANGKAT DAERAHRp5.169.000,00
164INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp82.208.000,00
165INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp5.075.440,00
166INSPEKTORATADMINISTRASI KEPEGAWAIAN PERANGKAT DAERAHRp194.500.000,00
167INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp42.699.200,00
168INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00
169DISPORAPARPENYADARAN, PEMBERDAYAAN, DAN PENGEMBANGAN PEMUDA DAN KEPEMUDAAN TERHADAP PEMUDA PELOPOR KABUPATEN/KOTA, WIRAUSAHA MUDA PEMULA, DAN PEMUDA KADER KABUPATEN/KOTARp93.712.500,00
170DISPORAPARPENGELOLAAN DESTINASI PARIWISATA KABUPATEN/KOTARp85.889.400,00