Beranda

Jumlah OPD 45 Selengkapnya
Jumlah Sub Kegiatan 51/ 1,371 Selengkapnya
Jumlah Paket 108/ 2,261 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 13 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/51
Paket Selesai 0% 0/108
Konstruksi Selesai 0% 0/0

Struktur Anggaran (DISPORAPAR)

BELANJA
Rp9.156.170.000,00 / 95%
Pegawai
Rp348.130.000,00 / 90%
Non Pegawai
Rp8.808.040.000,00 / 95%
Barang/Jasa
Rp8.656.240.000,00 / 95%
Modal
Rp151.800.000,00 / 95%

Struktur Sub Kegiatan (DISPORAPAR)

  • Jumlah 51
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 25
  • Belum Berjalan 26

Struktur Sumber Anggaran (DISPORAPAR)

  • APBD
    Rp12.501.566.223,00 / 99%
  • APBN
    Rp1.981.816.000,00 / 16%

Laporan Bulanan Fisik (DISPORAPAR)

Laporan Bulanan Keuangan (DISPORAPAR)

Rangking Pelaporan OPD

Total 45 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
2DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
3DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
4DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
5SETWANRp64.339.239.278,00Rp119.828.152,00Rp0,000%272700423Bulan 6
6DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
7INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
8DLHRp36.729.973.530,00Rp8.939.955.699,00Rp0,0024%5454002727Bulan 3
9DINKESRp236.765.144.752,00Rp32.546.906.077,00Rp0,0014%656500758Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
12KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
13DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
14DPUPRRp60.040.967.136,00Rp0,00Rp0,000%353500035Belum Berjalan
15BPKADRp19.754.828.226,00Rp0,00Rp0,000%111100011Belum Berjalan
16DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
17KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan
18KECAMATAN CARENANGRp2.717.772.864,00Rp0,00Rp0,000%660006Belum Berjalan
19DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
20BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
21BPBDRp17.758.169.735,00Rp6.295.265.768,00Rp0,0035%3434002212Bulan 6
22DKBPPPARp11.114.252.916,00Rp1.736.744.692,00Rp0,0016%3131001318Bulan 4
23KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
24BAPPERIDARp15.358.868.217,00Rp5.201.709.367,00Rp0,0034%6666005115Bulan 5
25KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
26DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
27KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
28DPMDRp8.680.688.455,00Rp2.777.862.230,00Rp0,0032%202000137Bulan 5
29KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
30DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
31RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
32DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
33KECAMATAN KRAMATWATURp6.710.483.685,00Rp2.492.828.655,00Rp0,0037%232300149Bulan 5
34KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
35KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
36KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
37KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
38KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
39BAPENDARp59.989.984.211,00Rp18.861.166.127,00Rp0,0031%3636002412Bulan 6
40KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
41KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
42SETDARp80.964.204.138,00Rp23.309.617.572,00Rp0,0029%555500505Bulan 3
43KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
44KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
45DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6

Kegiatan Terakhir Ditambah (DISPORAPAR)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1DISPORAPARPELAKSANAAN PENINGKATAN KAPASITAS SUMBER DAYA MANUSIA PARIWISATA DAN EKONOMI KREATIF TINGKAT DASARRp60.500.000,00
2DISPORAPARPELAKSANAAN PENINGKATAN KAPASITAS SUMBER DAYA MANUSIA PARIWISATA DAN EKONOMI KREATIF TINGKAT DASARRp88.100.000,00
3DISPORAPARPELAKSANAAN PENINGKATAN KAPASITAS SUMBER DAYA MANUSIA PARIWISATA DAN EKONOMI KREATIF TINGKAT DASARRp82.300.000,00
4DISPORAPARPENGEMBANGAN EKOSISTEM EKONOMI KREATIF&NBSPRp14.580.000,00
5DISPORAPARPEMASARAN PARIWISATA DALAM DAN LUAR NEGERI DAYA TARIK, DESTINASI DAN KAWASAN STRATEGIS PARIWISATA KABUPATEN/KOTARp62.100.000,00
6DISPORAPARPENGELOLAAN DESTINASI PARIWISATA KABUPATEN/KOTARp85.889.400,00
7DISPORAPARPENGELOLAAN KAWASAN STRATEGIS PARIWISATA KABUPATEN/KOTARp81.846.000,00
8DISPORAPARPEMBINAAN DAN PENGEMBANGAN OLAHRAGA REKREASIRp50.000.000,00
9DISPORAPARPEMBINAAN DAN PENGEMBANGAN OLAHRAGA REKREASIRp200.000.000,00
10DISPORAPARPEMBINAAN DAN PENGEMBANGAN OLAHRAGA PRESTASI TINGKAT DAERAH PROVINSIRp295.950.000,00

Kegiatan Terakhir Diubah (DISPORAPAR)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1DISPORAPARPENYADARAN, PEMBERDAYAAN, DAN PENGEMBANGAN PEMUDA DAN KEPEMUDAAN TERHADAP PEMUDA PELOPOR KABUPATEN/KOTA, WIRAUSAHA MUDA PEMULA, DAN PEMUDA KADER KABUPATEN/KOTARp93.712.500,00
2DISPORAPARPENGELOLAAN DESTINASI PARIWISATA KABUPATEN/KOTARp85.889.400,00
3DISPORAPARPENGEMBANGAN EKOSISTEM EKONOMI KREATIF&NBSPRp14.580.000,00
4DISPORAPARADMINISTRASI UMUM PERANGKAT DAERAHRp10.021.000,00
5DISPORAPARADMINISTRASI KEUANGAN PERANGKAT DAERAHRp303.000,00
6DISPORAPARPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp12.371.000,00
7DISPORAPARPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp12.301.000,00
8DISPORAPARPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp19.337.600,00
9DISPORAPARADMINISTRASI UMUM PERANGKAT DAERAHRp10.972.800,00
10DISPORAPARADMINISTRASI UMUM PERANGKAT DAERAHRp4.497.000,00