Beranda

Jumlah OPD 45 Selengkapnya
Jumlah Sub Kegiatan 35/ 1,368 Selengkapnya
Jumlah Paket 1/ 2,260 Selengkapnya
Jumlah Konstruksi 1/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 13 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/35
Paket Selesai 0% 0/1
Konstruksi Selesai 0% 0/1

Struktur Anggaran (DPUPR)

BELANJA
Rp383.387.104.712,00 / 92%
Pegawai
Rp1.745.745.000,00 / 93%
Non Pegawai
Rp381.641.359.712,00 / 92%
Barang/Jasa
Rp38.411.022.175,00 / 96%
Modal
Rp343.230.337.537,00 / 91%

Struktur Sub Kegiatan (DPUPR)

  • Jumlah 35
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 0
  • Belum Berjalan 35

Struktur Sumber Anggaran (DPUPR)

  • APBD
    Rp60.031.967.136,00 / 15%
  • APBN
    Rp9.000.000,00 / 0%

Laporan Bulanan Fisik (DPUPR)

Laporan Bulanan Keuangan (DPUPR)

Rangking Pelaporan OPD

Total 45 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
2KECAMATAN KRAMATWATURp6.710.483.685,00Rp2.492.828.655,00Rp0,0037%232300149Bulan 5
3KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
4KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
5KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
6KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
7KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
8KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
9KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
10KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
11KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
12KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
13KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
14KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
15SETDARp80.964.204.138,00Rp23.309.617.572,00Rp0,0029%555500505Bulan 3
16DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
17DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
18DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
19BAPENDARp59.989.984.211,00Rp18.861.166.127,00Rp0,0031%3636002412Bulan 6
20BAPPERIDARp15.358.868.217,00Rp5.201.709.367,00Rp0,0034%6666005115Bulan 5
21DPMDRp8.680.688.455,00Rp2.777.862.230,00Rp0,0032%202000137Bulan 5
22DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
23KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
24DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
25BPBDRp17.758.169.735,00Rp6.295.265.768,00Rp0,0035%3434002212Bulan 6
26DKBPPPARp11.114.252.916,00Rp1.736.744.692,00Rp0,0016%3131001318Bulan 4
27BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
28KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
29DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
30DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
31DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
32SETWANRp63.381.523.278,00Rp119.828.152,00Rp0,000%242400420Bulan 6
33DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
34INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
35DLHRp36.980.708.393,00Rp8.758.753.723,00Rp0,0024%5454002430Bulan 3
36DINKESRp236.765.144.752,00Rp32.546.906.077,00Rp0,0014%656500758Bulan 3
37KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
38DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
39DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
40DPUPRRp60.040.967.136,00Rp0,00Rp0,000%353500035Belum Berjalan
41DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
42BPKADRp19.754.828.226,00Rp0,00Rp0,000%111100011Belum Berjalan
43KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan
44KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
45KECAMATAN CARENANGRp2.717.772.864,00Rp0,00Rp0,000%660006Belum Berjalan

Kegiatan Terakhir Ditambah (DPUPR)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1DPUPRPENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN/KOTARp261.296.877,00
2DPUPRPENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN/KOTARp5.940.017.942,00
3DPUPRPENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTARp789.000.000,00
4DPUPRPENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTARp1.872.190.096,00
5DPUPRPENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTARp9.754.816.251,00
6DPUPRPENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTARp956.200.000,00
7DPUPRPENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTARp19.791.000,00
8DPUPRPENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTARp171.319.646,00
9DPUPRPENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI PRIMER DAN SEKUNDER PADA DAERAH IRIGASI YANG LUASNYA DI BAWAH 1000 HA DALAM 1 (SATU) DAERAH KABUPATEN/KOTARp125.573.535,00
10DPUPRPENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI PRIMER DAN SEKUNDER PADA DAERAH IRIGASI YANG LUASNYA DI BAWAH 1000 HA DALAM 1 (SATU) DAERAH KABUPATEN/KOTARp0,00

Kegiatan Terakhir Diubah (DPUPR)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1DPUPRPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp69.075.200,00
2DPUPRPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp88.332.000,00
3DPUPRADMINISTRASI KEUANGAN PERANGKAT DAERAHRp32.032.300.344,00
4DPUPRADMINISTRASI KEUANGAN PERANGKAT DAERAHRp6.000.000,00
5DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp9.021.500,00
6DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp413.988.000,00
7DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp199.113.800,00
8DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp74.450.569,00
9DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp28.800.000,00
10DPUPRADMINISTRASI UMUM PERANGKAT DAERAHRp20.600.100,00