Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 34/ 1,660 Selengkapnya
Jumlah Paket 0/ 2,353 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 20 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/34
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (INSPEKTORAT)

BELANJA
Rp8.818.000.000,00 / 93%
Pegawai
Rp1.381.970.000,00 / 94%
Non Pegawai
Rp7.436.030.000,00 / 93%
Barang/Jasa
Rp7.195.530.000,00 / 93%
Modal
Rp240.500.000,00 / 96%

Struktur Sub Kegiatan (INSPEKTORAT)

  • Jumlah 34
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 21
  • Belum Berjalan 13

Struktur Sumber Anggaran (INSPEKTORAT)

  • APBD
    Rp25.338.452.326,00 / 118%

Laporan Bulanan Fisik (INSPEKTORAT)

Laporan Bulanan Keuangan (INSPEKTORAT)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
2KESBANGPOLRp52.652.993.200,00Rp48.696.309.798,00Rp0,0092%323200284Bulan 7
3DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
4BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
5DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
6BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
7DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
8SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
9DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
10DPKDRp21.386.521.679,00Rp4.992.367.616,00Rp0,0023%3939102315Bulan 7
11DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
12DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
13DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
14DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
15DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
16DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
17BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
18BAPENDARp59.989.984.211,00Rp29.454.138.456,00Rp0,0049%363600288Bulan 7
19DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
20DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
21INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
22BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
23DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
24DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
25DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
26KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
27DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
28KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
29KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
30KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
31KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
32KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
33KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
34KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
35KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
36KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
37SETDARp80.964.204.138,00Rp36.516.320.456,00Rp0,0045%555500541Bulan 6
38KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
39KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
40KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
41KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
42KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
43RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6
44KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
45KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
46KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
47KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
48KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6

Kegiatan Terakhir Ditambah (INSPEKTORAT)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp12.818.800,00
2INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp5.560.800,00
3INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp42.699.200,00
4INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp2.876.000,00
5INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00
6INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp171.948.000,00
7INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp91.000.000,00
8INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp109.650.000,00
9INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp94.950.000,00
10INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp40.625.000,00

Kegiatan Terakhir Diubah (INSPEKTORAT)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp12.818.800,00
2INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp5.560.800,00
3INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp2.876.000,00
4INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp42.699.200,00
5INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00
6INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp565.000.000,00
7INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp171.948.000,00
8INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp91.000.000,00
9INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp109.650.000,00
10INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp94.950.000,00