Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 34/ 1,660 Selengkapnya
Jumlah Paket 0/ 2,353 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 20 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/34
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (INSPEKTORAT)

BELANJA
Rp8.818.000.000,00 / 93%
Pegawai
Rp1.381.970.000,00 / 94%
Non Pegawai
Rp7.436.030.000,00 / 93%
Barang/Jasa
Rp7.195.530.000,00 / 93%
Modal
Rp240.500.000,00 / 96%

Struktur Sub Kegiatan (INSPEKTORAT)

  • Jumlah 34
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 21
  • Belum Berjalan 13

Struktur Sumber Anggaran (INSPEKTORAT)

  • APBD
    Rp25.338.452.326,00 / 118%

Laporan Bulanan Fisik (INSPEKTORAT)

Laporan Bulanan Keuangan (INSPEKTORAT)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
2SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
3DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
4BAPENDARp59.989.984.211,00Rp29.454.138.456,00Rp0,0049%363600288Bulan 7
5DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
6DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
7BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
8DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
9DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
10BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
11DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
12DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
13DPKDRp21.386.521.679,00Rp4.992.367.616,00Rp0,0023%3939102315Bulan 7
14BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
15DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
16DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
17DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
18INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
19KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
20DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
21DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
22DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
23KESBANGPOLRp52.652.993.200,00Rp48.696.309.798,00Rp0,0092%323200284Bulan 7
24DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
25BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
26SETDARp80.964.204.138,00Rp36.516.320.456,00Rp0,0045%555500541Bulan 6
27DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
28DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
29KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
30KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
31KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
32KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
33KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
34KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
35KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
36KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
37KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
38KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
39KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
40KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
41KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
42KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
43KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
44KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
45KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
46KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
47KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
48RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6

Kegiatan Terakhir Ditambah (INSPEKTORAT)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp2.876.000,00
2INSPEKTORATPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp4.500.000,00
3INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp5.075.440,00
4INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp5.560.800,00
5INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp12.818.800,00
6INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp13.351.500,00
7INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp17.232.400,00
8INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp18.000.000,00
9INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp34.300.000,00
10INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00

Kegiatan Terakhir Diubah (INSPEKTORAT)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp2.876.000,00
2INSPEKTORATPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp4.500.000,00
3INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp5.075.440,00
4INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp5.560.800,00
5INSPEKTORATPERUMUSAN KEBIJAKAN TEKNIS DI BIDANG PENGAWASAN DAN FASILITASI PENGAWASANRp12.818.800,00
6INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp13.351.500,00
7INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp17.232.400,00
8INSPEKTORATADMINISTRASI UMUM PERANGKAT DAERAHRp18.000.000,00
9INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp34.300.000,00
10INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00