Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 34/ 1,660 Selengkapnya
Jumlah Paket 0/ 2,353 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 20 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/34
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (INSPEKTORAT)

BELANJA
Rp8.818.000.000,00 / 93%
Pegawai
Rp1.381.970.000,00 / 94%
Non Pegawai
Rp7.436.030.000,00 / 93%
Barang/Jasa
Rp7.195.530.000,00 / 93%
Modal
Rp240.500.000,00 / 96%

Struktur Sub Kegiatan (INSPEKTORAT)

  • Jumlah 34
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 21
  • Belum Berjalan 13

Struktur Sumber Anggaran (INSPEKTORAT)

  • APBD
    Rp25.338.452.326,00 / 118%

Laporan Bulanan Fisik (INSPEKTORAT)

Laporan Bulanan Keuangan (INSPEKTORAT)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
2DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
3DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
4SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
5DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
6INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
7DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
8DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
9KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
10KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
11BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
12KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
13KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
14KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
15KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
16KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
17KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
18KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
19KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
20KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
21KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
22KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
23DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
24DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
25KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
26RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6
27KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
28DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
29DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
30DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
31DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
32KESBANGPOLRp52.652.993.200,00Rp48.696.309.798,00Rp0,0092%323200284Bulan 7
33KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
34KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
35KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
36BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
37KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
38BAPENDARp59.989.984.211,00Rp29.454.138.456,00Rp0,0049%363600288Bulan 7
39BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
40DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
41BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
42DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
43DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
44DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
45DPKDRp21.386.521.679,00Rp4.992.367.616,00Rp0,0023%3939102315Bulan 7
46KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
47DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
48SETDARp80.964.204.138,00Rp36.516.320.456,00Rp0,0045%555500541Bulan 6

Kegiatan Terakhir Ditambah (INSPEKTORAT)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
11INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp42.699.200,00
12INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp2.876.000,00
13INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00
14INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp455.577.200,00
15INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp34.300.000,00
16INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp147.224.000,00
17INSPEKTORATPENYELENGGARAAN PENGAWASAN DENGAN TUJUAN TERTENTURp177.625.000,00
18INSPEKTORATPENYELENGGARAAN PENGAWASAN DENGAN TUJUAN TERTENTURp43.800.000,00
19INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp171.948.000,00
20INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp94.950.000,00

Kegiatan Terakhir Diubah (INSPEKTORAT)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
11INSPEKTORATADMINISTRASI KEPEGAWAIAN PERANGKAT DAERAHRp194.500.000,00
12INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp42.699.200,00
13INSPEKTORATPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp38.245.162,00
14INSPEKTORATADMINISTRASI KEUANGAN PERANGKAT DAERAHRp20.558.600.000,00
15INSPEKTORATPENYELENGGARAAN PENGAWASAN INTERNALRp565.000.000,00
16INSPEKTORATPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp711.849.750,00
17INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp455.577.200,00
18INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp34.300.000,00
19INSPEKTORATPENDAMPINGAN DAN ASISTENSIRp147.224.000,00
20INSPEKTORATPENYELENGGARAAN PENGAWASAN DENGAN TUJUAN TERTENTURp177.625.000,00