Beranda

Jumlah OPD 45 Selengkapnya
Jumlah Sub Kegiatan 14/ 1,470 Selengkapnya
Jumlah Paket 0/ 2,282 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 17 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/14
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BPKAD)

BELANJA
Rp15.531.147.685,00 / 95%
Pegawai
Rp1.013.960.000,00 / 88%
Non Pegawai
Rp14.517.187.685,00 / 95%
Barang/Jasa
Rp8.135.313.940,00 / 93%
Modal
Rp6.381.873.745,00 / 98%

Struktur Sub Kegiatan (BPKAD)

  • Jumlah 14
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 0
  • Belum Berjalan 14

Struktur Sumber Anggaran (BPKAD)

  • APBD
    Rp19.920.777.426,00 / 91%

Laporan Bulanan Fisik (BPKAD)

Laporan Bulanan Keuangan (BPKAD)

Rangking Pelaporan OPD

Total 45 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
2KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.064.381.092,00Rp0,0046%232300158Bulan 6
3KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
4RSDPRp354.846.540.730,00Rp115.934.894.512,00Rp0,0033%442011Bulan 6
5KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
6SETDARp80.964.204.138,00Rp24.727.951.793,00Rp0,0031%555500523Bulan 3
7KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
8KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
9BAPENDARp59.989.984.211,00Rp20.182.247.683,00Rp0,0034%3636002412Bulan 6
10KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
11KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
12KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
13KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
14KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
15KECAMATAN CARENANGRp2.983.484.794,00Rp1.139.216.579,00Rp0,0038%161600106Bulan 5
16KECAMATAN BINUANGRp3.529.468.586,00Rp1.136.366.784,00Rp0,0032%222200148Bulan 5
17DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
18DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
19DPMDRp28.957.104.294,00Rp5.722.273.966,00Rp0,0020%3939002514Bulan 5
20KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
21DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
22BAPPERIDARp15.358.868.217,00Rp6.251.812.638,00Rp0,0041%6666005412Bulan 6
23KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
24KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
25DKBPPPARp11.114.252.916,00Rp1.736.744.692,00Rp0,0016%3131001318Bulan 4
26BPBDRp17.758.169.735,00Rp6.295.265.768,00Rp0,0035%3434002212Bulan 6
27BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
28DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
29KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
30DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
31DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
32DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
33SETWANRp94.489.614.278,00Rp119.828.152,00Rp0,000%484800444Bulan 6
34DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
35DLHRp35.888.066.300,00Rp11.982.612.296,00Rp0,0033%5454003321Bulan 5
36INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
37DINKESRp265.660.188.487,00Rp32.546.906.077,00Rp0,0012%676700760Bulan 3
38KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
39DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
40KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
41DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
42DPUPRRp158.215.981.022,00Rp0,00Rp0,000%797900079Belum Berjalan
43BPKADRp19.920.777.426,00Rp0,00Rp0,000%141400014Belum Berjalan
44DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
45KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan

Kegiatan Terakhir Ditambah (BPKAD)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp57.728.400,00
2BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp18.000.000,00
3BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp90.220.800,00
4BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp108.384.600,00
5BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp179.700.000,00
6BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp38.740.000,00
7BPKADADMINISTRASI KEPEGAWAIAN PERANGKAT DAERAHRp1.440.000,00
8BPKADADMINISTRASI KEPEGAWAIAN PERANGKAT DAERAHRp56.000.000,00
9BPKADADMINISTRASI KEPEGAWAIAN PERANGKAT DAERAHRp17.600.000,00
10BPKADADMINISTRASI KEUANGAN PERANGKAT DAERAHRp19.158.137.626,00

Kegiatan Terakhir Diubah (BPKAD)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp108.384.600,00
2BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp90.220.800,00
3BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp18.000.000,00
4BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp57.728.400,00
5BPKADPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp28.878.000,00
6BPKADPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp14.560.000,00
7BPKADPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp5.080.000,00
8BPKADPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp146.308.000,00
9BPKADADMINISTRASI KEUANGAN PERANGKAT DAERAHRp19.158.137.626,00
10BPKADADMINISTRASI KEPEGAWAIAN PERANGKAT DAERAHRp17.600.000,00