Beranda

Jumlah OPD 54 Selengkapnya
Jumlah Sub Kegiatan 42/ 1,734 Selengkapnya
Jumlah Paket 0/ 2,457 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 13 Desember 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/42
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BPKAD)

BELANJA
Rp15.531.147.685,00 / 95%
Pegawai
Rp1.013.960.000,00 / 88%
Non Pegawai
Rp14.517.187.685,00 / 95%
Barang/Jasa
Rp8.135.313.940,00 / 93%
Modal
Rp6.381.873.745,00 / 98%

Struktur Sub Kegiatan (BPKAD)

  • Jumlah 42
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 0
  • Belum Berjalan 42

Struktur Sumber Anggaran (BPKAD)

  • APBD
    Rp701.102.355.756,00 / 3.191%

Laporan Bulanan Fisik (BPKAD)

Laporan Bulanan Keuangan (BPKAD)

Rangking Pelaporan OPD

Total 54 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KESBANGPOLRp54.149.729.200,00Rp53.230.066.110,00Rp0,0098%313100292Bulan 12
2KECAMATAN KRAMATWATURp6.539.127.385,00Rp6.100.188.132,00Rp0,0093%232380132Bulan 12
3KECAMATAN PETIRRp3.382.931.160,00Rp3.141.132.752,00Rp0,0093%191900163Bulan 12
4KECAMATAN TUNJUNG TEJARp2.986.933.133,00Rp2.732.023.295,00Rp0,0091%16168071Bulan 12
5KECAMATAN GUNUNG SARIRp3.165.391.238,00Rp2.682.487.315,00Rp0,0085%191900181Bulan 12
6KECAMATAN BOJONEGARARp3.419.175.666,00Rp2.867.964.377,00Rp0,0084%202000173Bulan 12
7DISKOPERINDAGRp18.472.070.721,00Rp15.228.348.394,00Rp0,0082%484800453Bulan 12
8BPBDRp17.124.434.537,00Rp13.799.419.224,00Rp0,0081%343400313Bulan 12
9BAPENDARp63.496.162.195,00Rp46.896.898.783,00Rp0,0074%363600342Bulan 12
10KECAMATAN CIKANDERp5.131.874.028,00Rp4.541.258.308,00Rp0,0088%191910153Bulan 11
11BAPPERIDARp18.369.468.213,00Rp15.772.233.636,00Rp0,0086%666610596Bulan 11
12KECAMATAN BAROSRp4.565.082.756,00Rp3.870.190.970,00Rp0,0085%222200220Bulan 11
13DISNAKERTRANSRp10.063.132.077,00Rp8.515.290.151,00Rp0,0085%383800308Bulan 11
14KECAMATAN CARENANGRp2.983.825.864,00Rp2.487.650.763,00Rp0,0083%161600160Bulan 11
15KECAMATAN TIRTAYASARp4.220.042.500,00Rp3.393.854.027,00Rp0,0080%262630212Bulan 11
16BKPSDMRp24.381.803.308,00Rp19.530.052.709,00Rp0,0080%444400404Bulan 11
17KECAMATAN KRAGILANRp4.408.615.176,00Rp3.524.521.234,00Rp0,0080%11110029Bulan 11
18KECAMATAN PABUARANRp4.133.960.301,00Rp3.263.857.544,00Rp0,0079%222200193Bulan 11
19DISPORAPARRp15.680.470.623,00Rp11.908.114.040,00Rp0,0076%5151004110Bulan 11
20KECAMATAN BINUANGRp3.529.468.586,00Rp2.648.723.621,00Rp0,0075%222200184Bulan 11
21DPMDRp28.032.000.994,00Rp19.802.524.534,00Rp0,0071%393900372Bulan 11
22SETWANRp113.332.140.326,00Rp79.613.091.688,00Rp0,0070%585800499Bulan 11
23DISDIKBUDRp1.173.406.449.459,00Rp809.412.515.378,00Rp0,0069%9292008111Bulan 11
24DISHUBRp45.476.563.866,00Rp30.551.069.406,00Rp0,0067%404000400Bulan 11
25KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp2.385.886.336,00Rp0,0066%202000119Bulan 11
26KECAMATAN BANDUNGRp3.391.962.830,00Rp2.624.546.308,00Rp0,0077%191900190Bulan 10
27KECAMATAN PONTANGRp4.688.905.724,00Rp3.506.651.533,00Rp0,0075%212118021Bulan 10
28SETDARp82.021.106.617,00Rp61.325.120.624,00Rp0,0075%555500550Bulan 10
29KECAMATAN PULO AMPELRp3.090.690.634,00Rp2.215.737.654,00Rp0,0072%222200175Bulan 10
30KECAMATAN CIOMASRp4.045.902.632,00Rp2.922.959.916,00Rp0,0072%151500123Bulan 9
31INSPEKTORATRp26.199.552.326,00Rp20.743.310.281,00Rp0,0079%343400268Bulan 8
32DINKESRp342.304.207.030,00Rp228.751.895.450,00Rp0,0067%7171005219Bulan 7
33DINSOSRp14.794.099.511,00Rp6.139.361.847,00Rp0,0041%4949001831Bulan 7
34DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
35DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
36DPRKPRp33.368.066.857,00Rp7.292.847.755,00Rp0,0022%383840313Bulan 7
37KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
38KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
39DPUPRRp158.706.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
40DPMPTSPRp14.445.961.442,00Rp5.488.942.917,00Rp0,0038%363600333Bulan 3
41KECAMATAN KIBINRp4.870.863.301,00Rp547.580.159,00Rp0,0011%330012Bulan 1
42DLHRp38.828.935.248,00Rp27.689.291.793,00Rp0,0071%565620504Bulan 11
43DISKOMINFOSATIKRp20.088.732.108,00Rp12.829.783.542,00Rp0,0064%4545003411Bulan 11
44DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
45DKPPRp33.211.879.772,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
46KECAMATAN WARINGIN KURUNGRp4.494.454.696,00Rp0,00Rp0,000%181800018Belum Berjalan
47BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
48KECAMATAN JAWILANRp956.600.000,00Rp0,00Rp0,000%110001Belum Berjalan
49KECAMATAN MANCAKRp2.775.255.248,00Rp0,00Rp0,000%330003Belum Berjalan
50RSDPRp382.243.812.965,00Rp303.566.432.574,00Rp0,0079%442020Bulan 12
51KECAMATAN CIRUASRp5.943.499.476,00Rp4.690.517.731,00Rp0,0079%181811061Bulan 11
52DPKDRp21.386.521.679,00Rp13.804.700.049,00Rp0,0065%393939000Bulan 11
53KECAMATAN CIKEUSALRp3.230.227.256,00Rp2.247.904.035,00Rp0,0070%16169061Bulan 6
54KECAMATAN CINANGKARp4.875.476.387,00Rp3.242.085.979,00Rp0,0066%191910171Bulan 6

Kegiatan Terakhir Ditambah (BPKAD)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BPKADKOORDINASI DAN PENGELOLAAN PERBENDAHARAAN DAERAHRp553.590.000,00
2BPKADKOORDINASI DAN PENGELOLAAN PERBENDAHARAAN DAERAHRp678.834.000,00
3BPKADKOORDINASI DAN PENGELOLAAN PERBENDAHARAAN DAERAHRp99.225.000,00
4BPKADKOORDINASI DAN PENGELOLAAN PERBENDAHARAAN DAERAHRp634.280.347.664,00
5BPKADKOORDINASI DAN PENGELOLAAN PERBENDAHARAAN DAERAHRp9.725.750,00
6BPKADKOORDINASI DAN PENGELOLAAN PERBENDAHARAAN DAERAHRp397.211.800,00
7BPKADKOORDINASI DAN PENYUSUNAN RENCANA ANGGARAN DAERAHRp149.164.000,00
8BPKADKOORDINASI DAN PENYUSUNAN RENCANA ANGGARAN DAERAHRp152.400.000,00
9BPKADKOORDINASI DAN PENYUSUNAN RENCANA ANGGARAN DAERAHRp254.800.000,00
10BPKADKOORDINASI DAN PENYUSUNAN RENCANA ANGGARAN DAERAHRp849.106.000,00

Kegiatan Terakhir Diubah (BPKAD)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BPKADKOORDINASI DAN PENYUSUNAN RENCANA ANGGARAN DAERAHRp156.504.000,00
2BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp11.648.460.000,00
3BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp108.384.600,00
4BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp90.220.800,00
5BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp18.000.000,00
6BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp57.728.400,00
7BPKADPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp28.878.000,00
8BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp410.000.000,00
9BPKADADMINISTRASI UMUM PERANGKAT DAERAHRp167.520.000,00
10BPKADPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp14.560.000,00