Beranda

Jumlah OPD 37 Selengkapnya
Jumlah Sub Kegiatan 66/ 1,046 Selengkapnya
Jumlah Paket 146/ 1,901 Selengkapnya
Jumlah Konstruksi 0/ 4 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 7 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/66
Paket Selesai 0% 0/146
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BAPPERIDA)

BELANJA
Rp15.743.653.000,00 / 93%
Pegawai
Rp2.330.371.000,00 / 91%
Non Pegawai
Rp13.413.282.000,00 / 94%
Barang/Jasa
Rp13.239.272.000,00 / 94%
Modal
Rp174.010.000,00 / 93%

Struktur Sub Kegiatan (BAPPERIDA)

  • Jumlah 66
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 51
  • Belum Berjalan 15

Struktur Sumber Anggaran (BAPPERIDA)

  • APBN
    Rp3.512.778.004,00 / 16%
  • APBD
    Rp11.846.090.213,00 / 53%

Laporan Bulanan Fisik (BAPPERIDA)

Laporan Bulanan Keuangan (BAPPERIDA)

Rangking Pelaporan OPD

Total 37 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
2KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
3KECAMATAN BOJONEGARARp3.023.108.310,00Rp1.087.802.282,00Rp0,0036%550041Bulan 6
4KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.005.696.334,00Rp0,0033%222200121Bulan 6
5KECAMATAN KRAMATWATURp6.710.483.685,00Rp1.934.113.904,00Rp0,0029%2323001310Bulan 4
6KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
7RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
8KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
9SETDARp80.964.204.138,00Rp17.863.024.080,00Rp0,0022%555500469Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
12KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
13KECAMATAN TUNJUNG TEJARp2.743.566.133,00Rp0,00Rp0,000%880008Belum Berjalan
14KECAMATAN BANDUNGRp3.288.787.830,00Rp987.472.142,00Rp0,0030%191900811Bulan 4
15DKBPPPARp1.024.305.885,00Rp55.379.686,00Rp0,005%161600412Bulan 4
16KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.430.662.723,00Rp0,0032%2626101213Bulan 5
17DKPPRp2.422.063.068,00Rp3.250.000,00Rp0,000%111100110Bulan 6
18DLHRp37.646.339.406,00Rp6.617.984.429,00Rp0,0018%5656002036Bulan 3
19BAPPERIDARp15.358.868.217,00Rp5.160.747.367,00Rp0,0034%6666005115Bulan 5
20DPMDRp7.114.923.137,00Rp1.040.849.374,00Rp0,0015%330021Bulan 5
21INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
22DINKESRp170.722.497.076,00Rp32.546.906.077,00Rp0,0019%626200755Bulan 3
23DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
24BAPENDARp59.989.984.211,00Rp18.464.163.357,00Rp0,0031%3636002214Bulan 6
25DISNAKERTRANSRp9.745.856.404,00Rp3.059.211.547,00Rp0,0031%3838001028Bulan 6
26BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
27DISDIKBUDRp948.364.906.128,00Rp4.905.660.000,00Rp0,001%585800652Bulan 6
28KESBANGPOLRp52.848.258.200,00Rp43.384.390.047,00Rp0,0082%3232001814Bulan 5
29DISKOPERINDAGRp13.876.746.651,00Rp4.624.481.565,00Rp0,0033%2626001511Bulan 5
30BPBDRp17.757.405.735,00Rp3.504.619.289,00Rp0,0020%3434002014Bulan 5
31DPRKPRp33.411.205.235,00Rp3.123.730.004,00Rp0,009%3939002712Bulan 5
32DISPORAPARRp14.483.382.223,00Rp5.491.533.107,00Rp0,0038%5151002328Bulan 4
33DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
34DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
35DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
36SETWANRp59.379.338.600,00Rp0,00Rp0,000%101000010Belum Berjalan
37DISKOMINFOSATIKRp20.088.732.108,00Rp4.537.295.137,00Rp0,0023%4545002421Bulan 5

Kegiatan Terakhir Ditambah (BAPPERIDA)

Total 6 hasil
#OPDNama KegiatanPagu Anggaran
61BAPPERIDAPenyusunan Perencanaan dan PendanaanRp7.500.000,00
62BAPPERIDAPenyusunan Perencanaan dan PendanaanRp230.665.000,00
63BAPPERIDAPenyusunan Perencanaan dan PendanaanRp228.093.633,00
64BAPPERIDAPERENCANAAN, PENGANGGARAN DAN EVALUASI KINERJA PERANGKAT DAERAHRp72.020.000,00
65BAPPERIDAPERENCANAAN, PENGANGGARAN DAN EVALUASI KINERJA PERANGKAT DAERAHRp63.400.000,00
66BAPPERIDAPERENCANAAN, PENGANGGARAN DAN EVALUASI KINERJA PERANGKAT DAERAHRp87.330.000,00

Kegiatan Terakhir Diubah (BAPPERIDA)

Total 6 hasil
#OPDNama KegiatanPagu Anggaran
61BAPPERIDAPenyusunan Perencanaan dan PendanaanRp7.500.000,00
62BAPPERIDAPenyusunan Perencanaan dan PendanaanRp230.665.000,00
63BAPPERIDAPenyusunan Perencanaan dan PendanaanRp228.093.633,00
64BAPPERIDAPERENCANAAN, PENGANGGARAN DAN EVALUASI KINERJA PERANGKAT DAERAHRp87.330.000,00
65BAPPERIDAPERENCANAAN, PENGANGGARAN DAN EVALUASI KINERJA PERANGKAT DAERAHRp72.020.000,00
66BAPPERIDAPERENCANAAN, PENGANGGARAN DAN EVALUASI KINERJA PERANGKAT DAERAHRp63.400.000,00