Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,659 Selengkapnya
Jumlah Paket 53/ 2,336 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 9 September 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN PULO AMPELRp3.090.690.634,00Rp2.015.851.172,00Rp0,0065%222200166Bulan 9
2DISKOMINFOSATIKRp20.088.732.108,00Rp9.986.118.769,00Rp0,0050%4545003312Bulan 9
3KESBANGPOLRp52.652.993.200,00Rp49.986.074.666,00Rp0,0095%323200284Bulan 8
4BAPPERIDARp15.358.868.217,00Rp10.052.297.472,00Rp0,0065%666600597Bulan 8
5INSPEKTORATRp25.338.452.326,00Rp16.126.396.430,00Rp0,0064%3434002410Bulan 8
6SETDARp80.964.204.138,00Rp48.664.234.015,00Rp0,0060%555500550Bulan 8
7KECAMATAN BINUANGRp3.529.468.586,00Rp2.034.837.172,00Rp0,0058%222200175Bulan 8
8KECAMATAN TIRTAYASARp4.429.731.000,00Rp2.532.737.919,00Rp0,0057%262640193Bulan 8
9DISHUBRp43.906.498.155,00Rp25.006.008.609,00Rp0,0057%404000400Bulan 8
10DLHRp35.193.241.220,00Rp19.100.645.268,00Rp0,0054%545400477Bulan 8
11BAPENDARp59.989.984.211,00Rp32.177.061.503,00Rp0,0054%363600315Bulan 8
12SETWANRp116.443.176.326,00Rp48.710.695.243,00Rp0,0042%5858004018Bulan 8
13DISPORAPARRp14.483.382.223,00Rp9.802.594.306,00Rp0,0068%5151003912Bulan 7
14KECAMATAN BANDUNGRp3.289.927.830,00Rp1.936.050.404,00Rp0,0059%191900181Bulan 7
15KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
16KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
17DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
18KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
19BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
20DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
21DISKOPERINDAGRp17.670.040.047,00Rp7.625.187.190,00Rp0,0043%4848003513Bulan 7
22RSDPRp354.846.540.730,00Rp151.016.098.699,00Rp0,0043%442020Bulan 7
23BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
24DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
25DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
26DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
27DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
28DPRKPRp33.593.718.408,00Rp7.092.083.403,00Rp0,0021%383840313Bulan 7
29KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
30KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.627.893.539,00Rp0,0050%16168053Bulan 6
31KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
32KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
33KECAMATAN CIRUASRp5.857.499.476,00Rp2.820.914.391,00Rp0,0048%18189081Bulan 6
34KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
35KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
36KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
37KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
38DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
39KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
40DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
41DPMDRp28.957.104.294,00Rp7.814.385.711,00Rp0,0027%3939002811Bulan 6
42DPKDRp21.386.521.679,00Rp5.294.166.908,00Rp0,0025%393933006Bulan 6
43DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
44KECAMATAN CINANGKARp4.916.521.531,00Rp2.260.790.852,00Rp0,0046%191910117Bulan 3
45DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
46KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
47BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
48KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp40.000.000,00
2BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp1.380.938.000,00
3BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
4BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
5BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
6BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.750.000,00
8BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp236.000.000,00
2BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
4BKPSDMPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp196.890.000,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
7BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
8BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00