Beranda

Jumlah OPD 49 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,690 Selengkapnya
Jumlah Paket 55/ 2,396 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 13 November 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/55
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 40
  • Belum Berjalan 4

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp29.509.141.595,00 / 132%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 49 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
2SETDARp80.168.371.397,00Rp56.899.048.937,00Rp0,0071%565600551Bulan 9
3KECAMATAN TIRTAYASARp4.220.042.500,00Rp3.103.271.471,00Rp0,0074%262630203Bulan 10
4KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
5KECAMATAN PETIRRp3.480.484.160,00Rp2.470.906.140,00Rp0,0071%191900163Bulan 9
6KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp2.150.354.257,00Rp0,0071%16166082Bulan 9
7KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
8KECAMATAN BANDUNGRp3.289.927.830,00Rp2.624.546.308,00Rp0,0080%191900190Bulan 10
9KECAMATAN PULO AMPELRp3.090.690.634,00Rp2.215.737.654,00Rp0,0072%222200175Bulan 10
10KECAMATAN BOJONEGARARp3.411.829.666,00Rp2.405.569.684,00Rp0,0071%202000155Bulan 10
11KECAMATAN BINUANGRp3.529.468.586,00Rp2.280.222.658,00Rp0,0065%222200184Bulan 10
12KECAMATAN BAROSRp4.201.565.756,00Rp2.671.181.859,00Rp0,0064%141400410Bulan 10
13KECAMATAN CIOMASRp4.045.902.632,00Rp2.922.959.916,00Rp0,0072%151500123Bulan 9
14KECAMATAN KRAMATWATURp6.710.483.685,00Rp4.648.043.247,00Rp0,0069%232300194Bulan 9
15KECAMATAN PONTANGRp4.788.698.728,00Rp3.132.636.319,00Rp0,0065%212120001Bulan 9
16KECAMATAN CARENANGRp2.983.484.794,00Rp1.913.473.348,00Rp0,0064%161600142Bulan 8
17KECAMATAN CIRUASRp5.857.499.476,00Rp3.507.732.877,00Rp0,0060%181811061Bulan 8
18KECAMATAN PABUARANRp4.133.960.301,00Rp2.129.784.512,00Rp0,0052%222200175Bulan 7
19RSDPRp354.846.540.730,00Rp160.311.584.428,00Rp0,0045%442020Bulan 7
20KECAMATAN CIKEUSALRp3.230.227.256,00Rp2.247.904.035,00Rp0,0070%16169061Bulan 6
21KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
22KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
23KECAMATAN CINANGKARp4.916.521.531,00Rp2.260.790.852,00Rp0,0046%191910117Bulan 3
24KECAMATAN GUNUNG SARIRp3.150.821.238,00Rp357.065.492,00Rp0,0011%191900712Bulan 1
25DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
26DLHRp35.193.241.220,00Rp21.860.153.162,00Rp0,0062%545400486Bulan 9
27BAPPERIDARp18.369.468.213,00Rp12.807.264.428,00Rp0,0070%666600606Bulan 11
28BAPENDARp63.496.162.194,00Rp42.764.666.434,00Rp0,0067%363600333Bulan 11
29BKPSDMRp29.509.141.595,00Rp19.530.052.709,00Rp0,0066%444400404Bulan 11
30DISKOMINFOSATIKRp20.088.732.108,00Rp12.829.783.542,00Rp0,0064%4545003411Bulan 11
31SETWANRp113.332.140.326,00Rp70.885.344.327,00Rp0,0063%5858004612Bulan 11
32KESBANGPOLRp54.149.729.200,00Rp52.075.588.637,00Rp0,0096%313100292Bulan 10
33DISNAKERTRANSRp9.736.316.404,00Rp7.267.777.429,00Rp0,0075%3838002513Bulan 10
34BPBDRp17.705.136.935,00Rp11.299.893.065,00Rp0,0064%343400304Bulan 10
35DISHUBRp45.476.563.866,00Rp28.164.724.960,00Rp0,0062%404000400Bulan 10
36DISPORAPARRp14.483.382.223,00Rp10.647.025.424,00Rp0,0074%5151003912Bulan 9
37DISKOPERINDAGRp17.670.040.047,00Rp11.401.152.357,00Rp0,0065%484800417Bulan 9
38INSPEKTORATRp25.338.452.326,00Rp19.272.616.846,00Rp0,0076%343400268Bulan 8
39DINKESRp342.304.207.030,00Rp228.751.895.450,00Rp0,0067%7171005219Bulan 7
40DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
41DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
42DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
43DPRKPRp33.593.718.408,00Rp7.092.083.403,00Rp0,0021%383840313Bulan 7
44DPKDRp21.386.521.679,00Rp13.716.523.850,00Rp0,0064%393939000Bulan 6
45DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
46DPMDRp28.957.104.294,00Rp7.814.385.711,00Rp0,0027%3939002811Bulan 6
47DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
48DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
49BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
2BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
4BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp108.030.000,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
8BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
2BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
4BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp108.030.000,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
8BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00