Beranda

Jumlah OPD 44 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,326 Selengkapnya
Jumlah Paket 53/ 2,253 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 12 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 31
  • Belum Berjalan 13

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 44 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN CIKEUSALRp3.167.927.756,00Rp1.352.673.842,00Rp0,0043%15158043Bulan 6
2KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
3RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
4KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
5KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
6DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
7DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
8DKPPRp33.211.811.573,00Rp7.025.116.540,00Rp0,0021%4747002522Bulan 6
9SETWANRp60.730.896.046,00Rp119.828.152,00Rp0,000%161600412Bulan 6
10DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
11INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
12DLHRp36.980.708.393,00Rp8.758.753.723,00Rp0,0024%5454002430Bulan 3
13DINKESRp236.765.144.752,00Rp32.546.906.077,00Rp0,0014%656500758Bulan 3
14KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
15DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
16KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
17DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
18DPUPRRp35.730.646.128,00Rp0,00Rp0,000%181800018Belum Berjalan
19BPKADRp19.754.828.226,00Rp0,00Rp0,000%111100011Belum Berjalan
20DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
21KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan
22DPMPTSPRp15.266.896.033,00Rp0,00Rp0,000%373700037Belum Berjalan
23KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
24KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
25KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
26KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
27KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
28KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
29DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
30BAPENDARp59.989.984.211,00Rp18.834.801.257,00Rp0,0031%3636002412Bulan 6
31BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
32DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
33KECAMATAN KRAMATWATURp6.710.483.685,00Rp2.492.828.655,00Rp0,0037%232300149Bulan 5
34BAPPERIDARp15.358.868.217,00Rp5.201.709.367,00Rp0,0034%6666005115Bulan 5
35KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
36DPMDRp8.460.790.175,00Rp2.757.312.230,00Rp0,0033%171700116Bulan 5
37DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
38DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
39BPBDRp17.757.405.735,00Rp3.504.619.289,00Rp0,0020%3434002014Bulan 5
40KECAMATAN BANDUNGRp3.288.787.830,00Rp987.472.142,00Rp0,0030%191900811Bulan 4
41KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
42DKBPPPARp3.369.500.268,00Rp168.944.738,00Rp0,005%242400816Bulan 4
43SETDARp80.964.204.138,00Rp19.243.624.907,00Rp0,0024%555500496Bulan 3
44KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
2BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
3BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
4BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
5BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
6BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
7BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
8BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
9BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
10BKPSDMPEMELIHARAAN BARANG MILIK DAERAH PENUNJANG URUSAN PEMERINTAHAN DAERAHRp2.475.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
2BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
3BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
4BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
5BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
6BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
7BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
8BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp16.522.000,00
9BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00
10BKPSDMPEMELIHARAAN BARANG MILIK DAERAH PENUNJANG URUSAN PEMERINTAHAN DAERAHRp2.475.000,00