Beranda

Jumlah OPD 46 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,532 Selengkapnya
Jumlah Paket 53/ 2,347 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 25 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 31
  • Belum Berjalan 13

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 46 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
2KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.334.774.094,00Rp0,0050%232300158Bulan 6
3KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
4DISPORAPARRp14.483.382.223,00Rp6.534.621.702,00Rp0,0045%5151002823Bulan 6
5KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
6BAPPERIDARp15.358.868.217,00Rp6.263.953.565,00Rp0,0041%6666005412Bulan 6
7DLHRp35.193.241.220,00Rp14.336.947.154,00Rp0,0041%5454004014Bulan 6
8KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
9KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
10KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
11KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
12KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
13KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
14KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.596.018.047,00Rp0,0036%262610178Bulan 6
15DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
16BPBDRp17.758.169.735,00Rp6.295.265.768,00Rp0,0035%3434002212Bulan 6
17BAPENDARp59.989.984.211,00Rp21.027.901.559,00Rp0,0035%363600279Bulan 6
18RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6
19DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
20KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
21DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
22DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
23DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
24BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
25DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
26DPUPRRp158.191.638.028,00Rp15.458.769.758,00Rp0,0010%7979002257Bulan 6
27SETWANRp116.420.476.326,00Rp119.828.152,00Rp0,000%585800454Bulan 6
28KECAMATAN CARENANGRp2.983.484.794,00Rp1.443.330.599,00Rp0,0048%161600106Bulan 5
29KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
30KECAMATAN BINUANGRp3.529.468.586,00Rp1.136.366.784,00Rp0,0032%222200148Bulan 5
31DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
32DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
33SETDARp80.964.204.138,00Rp24.727.951.793,00Rp0,0031%555500523Bulan 4
34INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
35DKBPPPARp13.040.383.916,00Rp1.807.490.692,00Rp0,0014%3838001523Bulan 4
36KECAMATAN CIRUASRp5.857.499.476,00Rp2.524.573.124,00Rp0,0043%18185076Bulan 3
37DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
38DINKESRp265.660.188.487,00Rp32.546.906.077,00Rp0,0012%676700760Bulan 3
39KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
40DPKDRp22.619.451.477,00Rp586.210.395,00Rp0,003%404000238Bulan 2
41KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
42DINSOSRp26.818.600,00Rp0,00Rp0,000%220002Belum Berjalan
43DISKANRp13.632.380.689,00Rp0,00Rp0,000%363600036Belum Berjalan
44DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
45BPKADRp65.083.421.542,00Rp0,00Rp0,000%363600036Belum Berjalan
46KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp40.000.000,00
2BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp1.380.938.000,00
3BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
4BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
5BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
6BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.750.000,00
8BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp236.000.000,00
2BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
4BKPSDMPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp196.890.000,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
7BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
8BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00