Beranda

Jumlah OPD 47 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,589 Selengkapnya
Jumlah Paket 53/ 2,348 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 10 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 47 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DISDUKCAPILRp20.582.687.800,00Rp9.426.967.767,00Rp0,0046%2626001214Bulan 7
2SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
3DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
4KESBANGPOLRp52.652.993.200,00Rp47.799.577.258,00Rp0,0091%323200275Bulan 6
5DLHRp35.193.241.220,00Rp14.336.947.154,00Rp0,0041%5454004014Bulan 6
6DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
7DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
8INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
9DINKESRp265.664.668.487,00Rp32.546.906.077,00Rp0,0012%686800761Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11DINSOSRp26.818.600,00Rp0,00Rp0,000%220002Belum Berjalan
12DISKANRp13.632.380.689,00Rp0,00Rp0,000%363600036Belum Berjalan
13KECAMATAN PABUARANRp4.375.998.301,00Rp0,00Rp0,000%212100021Belum Berjalan
14BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
15KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
16BPBDRp17.705.792.935,00Rp7.156.157.223,00Rp0,0040%3434002311Bulan 6
17BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
18DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
19DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
20DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
21DISPORAPARRp14.483.382.223,00Rp6.534.621.702,00Rp0,0045%5151002823Bulan 6
22DPKDRp21.356.651.477,00Rp1.475.432.418,00Rp0,007%393900336Bulan 2
23DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
24BAPENDARp59.989.984.211,00Rp29.171.867.349,00Rp0,0049%363600288Bulan 7
25DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
26DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
27DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
28BAPPERIDARp15.358.868.217,00Rp7.669.293.439,00Rp0,0050%666600579Bulan 7
29KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
30DISNAKERTRANSRp9.745.856.404,00Rp3.445.027.655,00Rp0,0035%3838001622Bulan 6
31SETDARp80.964.204.138,00Rp30.257.692.493,00Rp0,0037%555500541Bulan 6
32KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
33KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
34KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
35KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
36KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
37KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
38KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
39KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
40KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
41KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
42KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
43KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
44KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
45KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
46KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.350.374.094,00Rp0,0050%232300158Bulan 6
47RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
2BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
3BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
4BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
5BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
6BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
7BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
8BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
9BKPSDMPEMELIHARAAN BARANG MILIK DAERAH PENUNJANG URUSAN PEMERINTAHAN DAERAHRp2.475.000,00
10BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
2BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
3BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
4BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
5BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
6BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp16.522.000,00
7BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00
8BKPSDMPEMELIHARAAN BARANG MILIK DAERAH PENUNJANG URUSAN PEMERINTAHAN DAERAHRp2.475.000,00
9BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
10BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00