Beranda

Jumlah OPD 47 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,575 Selengkapnya
Jumlah Paket 53/ 2,347 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 6 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 31
  • Belum Berjalan 13

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 47 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DISDUKCAPILRp20.582.687.800,00Rp9.426.967.767,00Rp0,0046%2626001214Bulan 7
2SETWANRp116.443.176.326,00Rp15.954.967.742,00Rp0,0014%5858003721Bulan 7
3KESBANGPOLRp52.652.993.200,00Rp47.799.577.258,00Rp0,0091%323200275Bulan 6
4DLHRp35.193.241.220,00Rp14.336.947.154,00Rp0,0041%5454004014Bulan 6
5DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
6DISKOMINFOSATIKRp20.088.732.108,00Rp5.965.134.073,00Rp0,0030%4545002817Bulan 6
7DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
8INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
9DINKESRp265.660.188.487,00Rp32.546.906.077,00Rp0,0012%676700760Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11DINSOSRp26.818.600,00Rp0,00Rp0,000%220002Belum Berjalan
12DISKANRp13.632.380.689,00Rp0,00Rp0,000%363600036Belum Berjalan
13KECAMATAN PABUARANRp4.094.401.301,00Rp0,00Rp0,000%141400014Belum Berjalan
14BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
15KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
16BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
17BPBDRp17.705.792.935,00Rp7.156.157.223,00Rp0,0040%3434002311Bulan 6
18DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
19DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
20DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
21DISPORAPARRp14.483.382.223,00Rp6.534.621.702,00Rp0,0045%5151002823Bulan 6
22DPKDRp21.356.651.477,00Rp1.475.432.418,00Rp0,007%393900336Bulan 2
23DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
24BAPENDARp59.989.984.211,00Rp28.383.922.564,00Rp0,0047%363600279Bulan 7
25DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
26DISHUBRp43.906.498.155,00Rp16.373.975.823,00Rp0,0037%404000391Bulan 6
27DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
28BAPPERIDARp15.358.868.217,00Rp6.913.038.865,00Rp0,0045%666600579Bulan 6
29KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
30DISNAKERTRANSRp9.745.856.404,00Rp3.298.216.456,00Rp0,0034%3838001226Bulan 6
31SETDARp80.964.204.138,00Rp27.542.652.818,00Rp0,0034%555500523Bulan 5
32KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
33KECAMATAN BINUANGRp3.529.468.586,00Rp1.136.366.784,00Rp0,0032%222200148Bulan 5
34KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
35KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
36KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
37KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
38KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
39KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
40KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
41KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
42KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
43KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
44KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
45KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
46KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.350.374.094,00Rp0,0050%232300158Bulan 6
47RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
2BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
3BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
4BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
5BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
6BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
7BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
8BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
9BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
10BKPSDMPEMELIHARAAN BARANG MILIK DAERAH PENUNJANG URUSAN PEMERINTAHAN DAERAHRp2.475.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
2BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
3BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
4BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
5BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
6BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
7BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
8BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp16.522.000,00
9BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00
10BKPSDMPEMELIHARAAN BARANG MILIK DAERAH PENUNJANG URUSAN PEMERINTAHAN DAERAHRp2.475.000,00