Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,659 Selengkapnya
Jumlah Paket 53/ 2,336 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 11 September 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1BAPENDARp59.989.984.211,00Rp32.781.629.556,00Rp0,0055%363600324Bulan 9
2DISKOMINFOSATIKRp20.088.732.108,00Rp9.986.118.769,00Rp0,0050%4545003312Bulan 9
3KESBANGPOLRp52.652.993.200,00Rp49.986.074.666,00Rp0,0095%323200284Bulan 8
4BAPPERIDARp15.358.868.217,00Rp10.052.297.472,00Rp0,0065%666600597Bulan 8
5INSPEKTORATRp25.338.452.326,00Rp16.126.396.430,00Rp0,0064%3434002410Bulan 8
6DISHUBRp43.906.498.155,00Rp25.006.008.609,00Rp0,0057%404000400Bulan 8
7SETWANRp116.443.176.326,00Rp48.710.695.243,00Rp0,0042%5858004018Bulan 8
8DISPORAPARRp14.483.382.223,00Rp9.802.594.306,00Rp0,0068%5151003912Bulan 7
9DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
10BPBDRp17.705.792.935,00Rp8.842.062.168,00Rp0,0050%3434002311Bulan 7
11DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
12DISKOPERINDAGRp17.670.040.047,00Rp7.625.187.190,00Rp0,0043%4848003513Bulan 7
13BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
14DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
15DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
16DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
17DPRKPRp33.593.718.408,00Rp7.092.083.403,00Rp0,0021%383840313Bulan 7
18DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
19DPMDRp28.957.104.294,00Rp7.814.385.711,00Rp0,0027%3939002811Bulan 6
20DPKDRp21.386.521.679,00Rp5.334.834.844,00Rp0,0025%393933006Bulan 6
21DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
22DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
23BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
24DLHRp35.193.241.220,00Rp19.100.645.268,00Rp0,0054%545400477Bulan 8
25DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
26KECAMATAN KRAMATWATURp6.710.483.685,00Rp4.603.633.442,00Rp0,0069%232300176Bulan 9
27KECAMATAN PULO AMPELRp3.090.690.634,00Rp2.015.851.172,00Rp0,0065%222200166Bulan 9
28KECAMATAN PONTANGRp4.788.698.728,00Rp3.107.860.979,00Rp0,0065%212120001Bulan 9
29KECAMATAN BINUANGRp3.529.468.586,00Rp2.034.837.172,00Rp0,0058%222200175Bulan 8
30KECAMATAN BANDUNGRp3.289.927.830,00Rp1.936.050.404,00Rp0,0059%191900181Bulan 7
31KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
32RSDPRp354.846.540.730,00Rp151.016.098.699,00Rp0,0043%442020Bulan 7
33KECAMATAN CIRUASRp5.857.499.476,00Rp3.115.961.721,00Rp0,0053%181810071Bulan 6
34KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.627.893.539,00Rp0,0050%16168053Bulan 6
35KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
36KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
37KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
38KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
39KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
40KECAMATAN CINANGKARp4.916.521.531,00Rp2.260.790.852,00Rp0,0046%191910117Bulan 3
41KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
42KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
43KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
44KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
45KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
46KECAMATAN TIRTAYASARp4.429.731.000,00Rp2.580.917.839,00Rp0,0058%262640193Bulan 8
47SETDARp80.964.204.138,00Rp48.664.234.015,00Rp0,0060%555500550Bulan 8
48DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7

Kegiatan Terakhir Ditambah (BKPSDM)

Total 4 hasil
#OPDNama KegiatanPagu Anggaran
41BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
42BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
43BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
44BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 4 hasil
#OPDNama KegiatanPagu Anggaran
41BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
42BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
43BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
44BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00