Beranda

Jumlah OPD 47 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,615 Selengkapnya
Jumlah Paket 53/ 2,348 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 14 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 47 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
2BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
3KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
4BAPENDARp59.989.984.211,00Rp29.282.367.348,00Rp0,0049%363600288Bulan 7
5DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
6BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
7DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
8DINSOSRp9.112.285.183,00Rp9.890.000,00Rp0,000%282800226Bulan 7
9DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
10KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
11KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.350.374.094,00Rp0,0050%232300158Bulan 6
12KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
13KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
14KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
15KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
16KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
17KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
18KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
19KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
20DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
21BPBDRp17.705.792.935,00Rp7.156.157.223,00Rp0,0040%3434002311Bulan 6
22KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
23DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
24SETDARp80.964.204.138,00Rp30.257.692.493,00Rp0,0037%555500541Bulan 6
25KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
26KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
27RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6
28KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
29DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
30DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
31DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
32DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
33DPKDRp21.356.651.477,00Rp1.475.432.418,00Rp0,007%393900336Bulan 2
34DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
35SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
36DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
37KESBANGPOLRp52.652.993.200,00Rp47.799.577.258,00Rp0,0091%323200275Bulan 6
38DLHRp35.193.241.220,00Rp14.336.947.154,00Rp0,0041%5454004014Bulan 6
39DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
40DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
41INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
42DINKESRp265.664.668.487,00Rp46.729.110.977,00Rp0,0018%686800761Bulan 3
43KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
44DISKANRp13.632.380.689,00Rp143.782.200,00Rp0,001%363600135Bulan 1
45KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
46BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
47KECAMATAN PABUARANRp4.375.998.301,00Rp0,00Rp0,000%212100021Belum Berjalan

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
31BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
32BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
33BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
34BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
35BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
36BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
37BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
38BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
39BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
40BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
31BKPSDMMUTASI DAN PROMOSI ASNRp751.200.000,00
32BKPSDMPENGEMBANGAN KOMPETENSI ASNRp32.800.000,00
33BKPSDMPENGEMBANGAN KOMPETENSI ASNRp18.500.000,00
34BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
35BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
36BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
37BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
38BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
39BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp16.522.000,00
40BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00