Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,659 Selengkapnya
Jumlah Paket 53/ 2,336 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 10 September 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN PULO AMPELRp3.090.690.634,00Rp2.015.851.172,00Rp0,0065%222200166Bulan 9
2BAPENDARp59.989.984.211,00Rp32.781.629.556,00Rp0,0055%363600324Bulan 9
3KESBANGPOLRp52.652.993.200,00Rp49.986.074.666,00Rp0,0095%323200284Bulan 8
4BAPPERIDARp15.358.868.217,00Rp10.052.297.472,00Rp0,0065%666600597Bulan 8
5SETDARp80.964.204.138,00Rp48.664.234.015,00Rp0,0060%555500550Bulan 8
6KECAMATAN BINUANGRp3.529.468.586,00Rp2.034.837.172,00Rp0,0058%222200175Bulan 8
7KECAMATAN TIRTAYASARp4.429.731.000,00Rp2.532.737.919,00Rp0,0057%262640193Bulan 8
8DISHUBRp43.906.498.155,00Rp25.006.008.609,00Rp0,0057%404000400Bulan 8
9DISPORAPARRp14.483.382.223,00Rp9.802.594.306,00Rp0,0068%5151003912Bulan 7
10KECAMATAN BANDUNGRp3.289.927.830,00Rp1.936.050.404,00Rp0,0059%191900181Bulan 7
11KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
12KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
13KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
14BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
15DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
16DISKOPERINDAGRp17.670.040.047,00Rp7.625.187.190,00Rp0,0043%4848003513Bulan 7
17BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
18DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
19DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
20DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
21DPRKPRp33.593.718.408,00Rp7.092.083.403,00Rp0,0021%383840313Bulan 7
22KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
23KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
24KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
25KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
26KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
27KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
28KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
29DPMDRp28.957.104.294,00Rp7.814.385.711,00Rp0,0027%3939002811Bulan 6
30DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
31DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
32DISKOMINFOSATIKRp20.088.732.108,00Rp9.986.118.769,00Rp0,0050%4545003312Bulan 9
33INSPEKTORATRp25.338.452.326,00Rp16.126.396.430,00Rp0,0064%3434002410Bulan 8
34DLHRp35.193.241.220,00Rp19.100.645.268,00Rp0,0054%545400477Bulan 8
35SETWANRp116.443.176.326,00Rp48.710.695.243,00Rp0,0042%5858004018Bulan 8
36DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
37DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
38DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
39DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
40KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
41BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
42KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
43RSDPRp354.846.540.730,00Rp151.016.098.699,00Rp0,0043%442020Bulan 7
44KECAMATAN PONTANGRp4.788.698.728,00Rp3.111.310.979,00Rp0,0065%212120001Bulan 6
45KECAMATAN CIRUASRp5.857.499.476,00Rp3.115.961.721,00Rp0,0053%181810071Bulan 6
46KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.627.893.539,00Rp0,0050%16168053Bulan 6
47DPKDRp21.386.521.679,00Rp5.334.834.844,00Rp0,0025%393933006Bulan 6
48KECAMATAN CINANGKARp4.916.521.531,00Rp2.260.790.852,00Rp0,0046%191910117Bulan 3

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
31BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
32BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
33BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
34BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
35BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
36BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
37BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
38BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
39BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
40BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
31BKPSDMMUTASI DAN PROMOSI ASNRp751.200.000,00
32BKPSDMPENGEMBANGAN KOMPETENSI ASNRp32.800.000,00
33BKPSDMPENGEMBANGAN KOMPETENSI ASNRp18.500.000,00
34BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
35BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
36BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
37BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
38BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
39BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp16.522.000,00
40BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00