Beranda

Jumlah OPD 41 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,110 Selengkapnya
Jumlah Paket 53/ 2,018 Selengkapnya
Jumlah Konstruksi 0/ 4 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 10 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 31
  • Belum Berjalan 13

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 41 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
2KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
3KECAMATAN PONTANGRp3.112.512.204,00Rp1.236.236.844,00Rp0,0040%331011Bulan 6
4KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
5KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
6KECAMATAN BOJONEGARARp3.174.678.866,00Rp1.126.963.041,00Rp0,0035%10100091Bulan 6
7KECAMATAN KRAMATWATURp6.710.483.685,00Rp1.934.113.904,00Rp0,0029%2323001310Bulan 4
8KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
9RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
10SETDARp80.964.204.138,00Rp18.082.204.080,00Rp0,0022%555500469Bulan 3
11KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
12KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
13KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
14KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
15KECAMATAN PETIRRp2.933.324.000,00Rp0,00Rp0,000%110001Belum Berjalan
16KECAMATAN CIKEUSALRp2.613.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
17KECAMATAN BANDUNGRp3.288.787.830,00Rp987.472.142,00Rp0,0030%191900811Bulan 4
18DKBPPPARp1.024.305.885,00Rp55.379.686,00Rp0,005%161600412Bulan 4
19KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
20DKPPRp4.606.076.687,00Rp415.807.816,00Rp0,009%2222001111Bulan 6
21DLHRp37.646.339.406,00Rp6.617.984.429,00Rp0,0018%5656002036Bulan 3
22BAPPERIDARp15.358.868.217,00Rp5.160.747.367,00Rp0,0034%6666005115Bulan 5
23DPMDRp7.114.923.137,00Rp1.040.849.374,00Rp0,0015%330021Bulan 5
24INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
25DINKESRp170.722.497.076,00Rp32.546.906.077,00Rp0,0019%626200755Bulan 3
26DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
27BAPENDARp59.989.984.211,00Rp18.667.596.407,00Rp0,0031%3636002313Bulan 6
28DISNAKERTRANSRp9.745.856.404,00Rp3.059.211.547,00Rp0,0031%3838001028Bulan 6
29BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
30DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
31DISDIKBUDRp1.157.689.270.415,00Rp4.905.660.000,00Rp0,000%838300677Bulan 6
32SETWANRp59.345.639.850,00Rp5.465.000,00Rp0,000%10100019Bulan 6
33KESBANGPOLRp52.848.258.200,00Rp43.384.390.047,00Rp0,0082%3232001814Bulan 5
34DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
35BPBDRp17.757.405.735,00Rp3.504.619.289,00Rp0,0020%3434002014Bulan 5
36DISKOPERINDAGRp13.876.746.651,00Rp4.667.278.615,00Rp0,0034%2626001610Bulan 4
37DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
38DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
39DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
40DPMPTSPRp8.874.322.231,00Rp0,00Rp0,000%101000010Belum Berjalan
41DISKOMINFOSATIKRp20.088.732.108,00Rp4.883.733.696,00Rp0,0024%4545002421Bulan 6

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
21BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
22BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
23BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
24BKPSDMPENGEMBANGAN KOMPETENSI ASNRp18.500.000,00
25BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
26BKPSDMPENGEMBANGAN KOMPETENSI ASNRp32.800.000,00
27BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
28BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
29BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.750.000,00
30BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
21BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp108.030.000,00
22BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp14.304.000,00
23BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
24BKPSDMPENGEMBANGAN KOMPETENSI ASNRp32.800.000,00
25BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
26BKPSDMPENGEMBANGAN KOMPETENSI ASNRp18.500.000,00
27BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
28BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
29BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
30BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00