Beranda

Jumlah OPD 37 Selengkapnya
Jumlah Sub Kegiatan 10/ 1,046 Selengkapnya
Jumlah Paket 0/ 1,901 Selengkapnya
Jumlah Konstruksi 0/ 4 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 7 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/10
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (SETWAN)

BELANJA
Rp62.620.000.000,00 / 88%
Pegawai
Rp398.495.000,00 / 63%
Non Pegawai
Rp62.221.505.000,00 / 88%
Barang/Jasa
Rp61.413.525.000,00 / 88%
Modal
Rp807.980.000,00 / 98%

Struktur Sub Kegiatan (SETWAN)

  • Jumlah 10
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 0
  • Belum Berjalan 10

Struktur Sumber Anggaran (SETWAN)

  • APBD
    Rp59.379.338.600,00 / 60%

Laporan Bulanan Fisik (SETWAN)

Laporan Bulanan Keuangan (SETWAN)

Rangking Pelaporan OPD

Total 37 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
2KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
3KECAMATAN BOJONEGARARp3.023.108.310,00Rp1.087.802.282,00Rp0,0036%550041Bulan 6
4KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.005.696.334,00Rp0,0033%222200121Bulan 6
5KECAMATAN KRAMATWATURp6.710.483.685,00Rp1.934.113.904,00Rp0,0029%2323001310Bulan 4
6KECAMATAN BINUANGRp3.497.308.586,00Rp937.053.493,00Rp0,0027%222200139Bulan 4
7RSDPRp354.846.540.730,00Rp73.369.275.998,00Rp0,0021%441012Bulan 4
8KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3
9SETDARp80.964.204.138,00Rp17.863.024.080,00Rp0,0022%555500469Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
12KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
13KECAMATAN TUNJUNG TEJARp2.743.566.133,00Rp0,00Rp0,000%880008Belum Berjalan
14KECAMATAN BANDUNGRp3.288.787.830,00Rp987.472.142,00Rp0,0030%191900811Bulan 4
15DKBPPPARp1.024.305.885,00Rp55.379.686,00Rp0,005%161600412Bulan 4
16KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.430.662.723,00Rp0,0032%2626101213Bulan 5
17DKPPRp2.422.063.068,00Rp3.250.000,00Rp0,000%111100110Bulan 6
18DLHRp37.646.339.406,00Rp6.617.984.429,00Rp0,0018%5656002036Bulan 3
19BAPPERIDARp15.358.868.217,00Rp5.160.747.367,00Rp0,0034%6666005115Bulan 5
20DPMDRp7.114.923.137,00Rp1.040.849.374,00Rp0,0015%330021Bulan 5
21INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
22DINKESRp170.722.497.076,00Rp32.546.906.077,00Rp0,0019%626200755Bulan 3
23DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
24BAPENDARp59.989.984.211,00Rp18.464.163.357,00Rp0,0031%3636002214Bulan 6
25DISNAKERTRANSRp9.745.856.404,00Rp3.059.211.547,00Rp0,0031%3838001028Bulan 6
26BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
27DISDIKBUDRp948.364.906.128,00Rp4.905.660.000,00Rp0,001%585800652Bulan 6
28KESBANGPOLRp52.848.258.200,00Rp43.384.390.047,00Rp0,0082%3232001814Bulan 5
29DISKOPERINDAGRp13.876.746.651,00Rp4.624.481.565,00Rp0,0033%2626001511Bulan 5
30BPBDRp17.757.405.735,00Rp3.504.619.289,00Rp0,0020%3434002014Bulan 5
31DPRKPRp33.411.205.235,00Rp3.123.730.004,00Rp0,009%3939002712Bulan 5
32DISPORAPARRp14.483.382.223,00Rp5.491.533.107,00Rp0,0038%5151002328Bulan 4
33DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
34DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
35DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
36SETWANRp59.379.338.600,00Rp0,00Rp0,000%101000010Belum Berjalan
37DISKOMINFOSATIKRp20.088.732.108,00Rp4.537.295.137,00Rp0,0023%4545002421Bulan 5

Kegiatan Terakhir Ditambah (SETWAN)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1SETWANAdministrasi Keuangan Perangkat DaerahRp10.575.000,00
2SETWANAdministrasi Keuangan Perangkat DaerahRp46.353.600,00
3SETWANAdministrasi Keuangan Perangkat DaerahRp59.215.000.000,00
4SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp8.790.000,00
5SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp27.810.000,00
6SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp13.210.000,00
7SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp13.210.000,00
8SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp10.570.000,00
9SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp9.340.000,00
10SETWANPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp24.480.000,00

Kegiatan Terakhir Diubah (SETWAN)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1SETWANAdministrasi Keuangan Perangkat DaerahRp10.575.000,00
2SETWANAdministrasi Keuangan Perangkat DaerahRp46.353.600,00
3SETWANAdministrasi Keuangan Perangkat DaerahRp59.215.000.000,00
4SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp9.340.000,00
5SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp10.570.000,00
6SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp13.210.000,00
7SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp13.210.000,00
8SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp27.810.000,00
9SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp8.790.000,00
10SETWANPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp24.480.000,00