Beranda

Jumlah OPD 47 Selengkapnya
Jumlah Sub Kegiatan 58/ 1,615 Selengkapnya
Jumlah Paket 0/ 2,348 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 14 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/58
Paket Selesai 0% 0/0
Konstruksi Selesai 0% 0/0

Struktur Anggaran (SETWAN)

BELANJA
Rp62.620.000.000,00 / 88%
Pegawai
Rp398.495.000,00 / 63%
Non Pegawai
Rp62.221.505.000,00 / 88%
Barang/Jasa
Rp61.413.525.000,00 / 88%
Modal
Rp807.980.000,00 / 98%

Struktur Sub Kegiatan (SETWAN)

  • Jumlah 58
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 38
  • Belum Berjalan 20

Struktur Sumber Anggaran (SETWAN)

  • APBN
    Rp3.000.000,00 / 0%
  • APBD
    Rp116.440.176.326,00 / 117%

Laporan Bulanan Fisik (SETWAN)

Laporan Bulanan Keuangan (SETWAN)

Rangking Pelaporan OPD

Total 47 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
2SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
3DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
4KESBANGPOLRp52.652.993.200,00Rp47.799.577.258,00Rp0,0091%323200275Bulan 6
5DLHRp35.193.241.220,00Rp14.336.947.154,00Rp0,0041%5454004014Bulan 6
6DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
7DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
8INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
9DINKESRp265.664.668.487,00Rp46.729.110.977,00Rp0,0018%686800761Bulan 3
10KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
11KECAMATAN PABUARANRp4.375.998.301,00Rp0,00Rp0,000%212100021Belum Berjalan
12BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
13KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
14BPBDRp17.705.792.935,00Rp7.156.157.223,00Rp0,0040%3434002311Bulan 6
15BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
16DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
17DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
18DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
19DPKDRp21.356.651.477,00Rp1.475.432.418,00Rp0,007%393900336Bulan 2
20DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
21DINSOSRp9.112.285.183,00Rp9.890.000,00Rp0,000%282800226Bulan 7
22BAPENDARp59.989.984.211,00Rp29.282.367.348,00Rp0,0049%363600288Bulan 7
23DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
24DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
25DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
26DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
27BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
28KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
29DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
30DISKANRp13.632.380.689,00Rp4.666.631.478,00Rp0,0034%3636002412Bulan 5
31SETDARp80.964.204.138,00Rp30.257.692.493,00Rp0,0037%555500541Bulan 6
32KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
33KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
34KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
35KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
36KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
37KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
38KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
39KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
40KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
41KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
42KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
43KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
44KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
45KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
46KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.350.374.094,00Rp0,0050%232300158Bulan 6
47RSDPRp354.846.540.730,00Rp117.217.699.112,00Rp0,0033%442020Bulan 6

Kegiatan Terakhir Ditambah (SETWAN)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1SETWANPeningkatan Kapasitas DPRDRp212.795.000,00
2SETWANPengawasan Penyelenggaraan PemerintahanRp209.100.000,00
3SETWANPembahasan Kebijakan AnggaranRp201.570.000,00
4SETWANPembahasan Kebijakan AnggaranRp531.540.000,00
5SETWANPembahasan Kebijakan AnggaranRp718.100.000,00
6SETWANPembahasan Kebijakan AnggaranRp345.040.000,00
7SETWANPembahasan Kebijakan AnggaranRp531.570.000,00
8SETWANPembentukan Perda dan Peraturan DPRDRp364.400.000,00
9SETWANPembentukan Perda dan Peraturan DPRDRp75.000.000,00
10SETWANPembentukan Perda dan Peraturan DPRDRp280.000.000,00

Kegiatan Terakhir Diubah (SETWAN)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp9.340.000,00
2SETWANPerencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat DaerahRp7.962.500,00
3SETWANPengawasan Penyelenggaraan PemerintahanRp209.100.000,00
4SETWANAdministrasi Keuangan Perangkat DaerahRp6.850.000,00
5SETWANAdministrasi Keuangan Perangkat DaerahRp41.353.600,00
6SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp3.618.750,00
7SETWANPerencanaan, Penganggaran dan Evaluasi Kinerja Perangkat DaerahRp15.800.000,00
8SETWANLayanan Keuangan dan Kesejahteraan DPRDRp250.000.000,00
9SETWANLayanan Administrasi DPRDRp25.600.000,00
10SETWANPembentukan Perda dan Peraturan DPRDRp280.000.000,00